MOVING DIRT · BUILDING ROADS · DEVELOPING COMMUNITIESBUILD YOUR CAREER WITH A FAMILY-OWNED HOUSTON CONTRACTOR832-409-5740WE ARE HIRING: Fuel Lube Truck Drivers, PM Mechanics, Foremen, Superintendents, CDL Water Truck Drivers, Estimators, and Operators.MOVING DIRT · BUILDING ROADS · DEVELOPING COMMUNITIESBUILD YOUR CAREER WITH A FAMILY-OWNED HOUSTON CONTRACTOR832-409-5740WE ARE HIRING: Fuel Lube Truck Drivers, PM Mechanics, Foremen, Superintendents, CDL Water Truck Drivers, Estimators, and Operators.
NorthTex Construction
Home/Projects/Sterling Traditions Sections 1 & 3 Utilities, Drainage & Paving
● Active Jobsite

Sterling Traditions Sections 1 & 3 Utilities, Drainage & Paving

Water, sanitary sewer, drainage, and concrete paving improvements for Sterling Traditions Sections 1 & 3.

Budget
$3.9M
Timeline
4 months
Team
18–30 personnel
Scope
Water, sanitary sewer, drainage, and concrete paving improvements for Sterling Traditions Sections 1 & 3.
Status
Active
Client
Liberty County Municipal Utility District No. 13A

Project Overview

Water, sanitary sewer, drainage, and concrete paving improvements for Sterling Traditions Sections 1 & 3.

Water Line
6-inch and 8-inch C900 PVC waterline
Wastewater
8-inch and 10-inch PVC sanitary sewer
Storm Sewer
RCP storm sewer up to 60-inch
Box Culverts
5’x5’, 6’x5’, 7’x5’, and 10’x5’ reinforced concrete box culverts
Paving
6-inch and 8.5-inch reinforced concrete pavement
Subgrade
8-inch lime-flyash stabilized subgrade
Concrete
Curbs, sidewalks, ADA ramps, inlets, manholes, junction boxes, and paving headers
Drainage
Storm sewer, inlets, manholes, junction boxes, box culverts, and groundwater control
Restoration
SWPPP compliance, silt fencing, stabilized construction exits, grading, and cleanup

Scope of Work

  • Water distribution system installation
  • Sanitary sewer installation
  • Storm sewer and drainage improvements
  • Reinforced concrete box culvert installation
  • Storm manholes, junction boxes, and inlets
  • Concrete paving and roadway construction
  • Lime-flyash stabilized subgrade preparation
  • Concrete curbs, sidewalks, and ADA ramps
  • Trench safety and dewatering
  • SWPPP controls, construction staking, grading, and site cleanup
“Self-performed civil from clearing through final paving — one schedule, one foreman, one number.”

Project Timeline

  1. ✓ Complete · Q2 2026
    Mobilization & Site Preparation

    Mobilize crews and equipment, prepare the site, complete construction staking, install SWPPP controls, and begin clearing and grading.

  2. ✓ Complete · Q2 2026
    Water & Sanitary Sewer

    Install water distribution lines, valves, flushing assemblies, sanitary sewer pipe, manholes, service leads, trench safety, and dewatering.

  3. ● Active · Q2–Q3 2026
    Drainage Improvements

    Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.

  4. Upcoming · Q3 2026
    Paving & Closeout

    Complete stabilized subgrade, reinforced concrete paving, curbs, sidewalks, ADA ramps, traffic control devices, final grading, and cleanup.

/05Outcomes

What we delivered.

Utilities
Infrastructure
Water and sanitary sewer systems
Drainage
Stormwater
Storm sewer and box culverts
Paving
Roadway Improvements
Concrete pavement and curbs
Sidewalks
Pedestrian Access
Sidewalks and ADA ramps

Building something
like this?

If you have a similar scope to bid, send us your drawings and target schedule. We respond inside 48 hours.